Total Tayangan Halaman

Tampilkan postingan dengan label PLTF Bay duljimbon PDQ. Tampilkan semua postingan
Tampilkan postingan dengan label PLTF Bay duljimbon PDQ. Tampilkan semua postingan

Kamis, 09 September 2010

Welcome to our meeting today we will have a disscusion about
 Total Productive Maintenance roles will be played by
•Laura Dietrich: Maintenance Manger
•Antoinette Lockett: Plant Manger
•Waseem Manzoor: Quality Manger
Xiaoyan Liu: Production Manger
Meeting Agenda
I.Understanding Downtime -Group
II.Major Losses of TPM -Antoinette Lockett
I.Planned Downtime Losses -Xiaoyan Liu
II.Unplanned Downtime Losses -Laura Dietrich
III.Reduce Speed Losses-
IV.Poor Quality Losses -Waseem Manzoor
III.Total Productive Maintenance
I.What is TPM -Antoinette Lockett
II.Breakdown of TPM -Laura Dietrich
III.TPM History -Laura Dietrich
IV.TPM Evolution
V.Goal of TPM -Antoinette Lockett
Three Principles of Prevention  
Meeting Agenda Cont.
I.TPM-8 Pillars-Laura Dietrich
II.Kick off TPM
I.Launching TPM- Preparatory Stage-Antoinette Lockett
II.Autonomous Maintenance- Xiaoyan Liu
III.Equipment Management Life Cycle- Xiaoyan Liu
IV.TPM Implementation-Waseem Manzoor
V.Launching TPM- Stabilization-Waseen Manzoor
VI.Eliminating Equipment Losses-Laura Dietrich
VII.Improvement Goals for Chronic Losses-Laura Dietrich
III.Overall Equipment Efficiency
I.What is OEE-Xiaoyan Liu
II.OEE Factors-Xiayon Liu
III.Calculating OEE-Waseem Manzoor
IV.TPM Benefits-Xiaoyan Liu
Reduced Speed Losses
•Idling and minor stoppages
Slow-downs
Poor Quality Losses
•Process non-conformities
Scrap

TABEL OMH,OUT FLOW,FLOW IN,FROM TO CHART

TOTAL OMH ( ONKOS MATERIAL HANDLING )

DARI
KE
NAMA
KOMPONEN
PRODUK/
JAM
BERAT BENTUK/ BIJI
BERAT TOTAL
ALAT ANGKUT
OMH
(Rp/meter/gerakan )
JARAK
(meter)

TOTAL/
ONGKOS
RECEIVING
DEPARTEMEN
100
KAKI KERANGKA
90
250 gram
22.500 gram
Hand Pallet
Rp. 3.500 ;
10
Rp. 35.000
DEPARTEMEN
100
ASSEMBLING
100
KAKI
KERANGKA
90
250 gram
22.500 gram
Conveyor
Rp. 3.500
4
Rp. 14.000
ASSEMBLING
100
DEPARTEMEN
200
FITTING
90
300 gram
27.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
DEPARTEMEN
200
ASSEMBLING
200
FITTING
90
300 gram
27.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
ASSEMBLING
200
DEPARTEMEN
300
PIRINGAN
90
200 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
DEPARTEMEN
300
ASSEMBLING
300
PIRINGAN
90
200 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
ASSEMBLING
300
DEPARTEMEN
400
PEER KUPU
90
20 gram
180 gram
Man
Rp. 3.500
2
Rp.7.000
DEPARTEMEN
400
ASSEMBLING
400
PEER KUPU
90
20 gram
180 gram
Man
Rp. 3.500
2
Rp.7.000
ASSEMBLING
400
DEPARTEMEN
500
REFLECTOR
120
150 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
DEPARTEMEN
500
ASSEMBLING
500
REFLECTOR
120
150 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
ASSEMBLING
500
PACKAGING
DOWNLIGHT
30
950 gram
28.500 gram
Conveyor
Rp. 3.500
5
Rp.17.500
PACKAGING
SHIPPING
DOWNLIGHT
30
950 gram
28.500 gram
Forklift
Rp. 3.500
10
Rp.35.000







TOTAL

Rp.199.500

TOTAL OMH ( ONKOS MATERIAL HANDLING )

DARI
KE
NAMA
KOMPONEN
PRODUK/
JAM
BERAT BENTUK/ BIJI
BERAT TOTAL
ALAT ANGKUT
OMH
(Rp/meter/gerakan )
JARAK
(meter)

TOTAL/
ONGKOS
RECEIVING
DEPARTEMEN
100
KAKI KERANGKA
90
250 gram
22.500 gram
Hand Pallet
Rp. 3.500 ;
10
Rp. 35.000
DEPARTEMEN
100
ASSEMBLING
100
KAKI
KERANGKA
90
250 gram
22.500 gram
Conveyor
Rp. 3.500
4
Rp. 14.000
ASSEMBLING
100
DEPARTEMEN
200
FITTING
90
300 gram
27.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
DEPARTEMEN
200
ASSEMBLING
200
FITTING
90
300 gram
27.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
ASSEMBLING
200
DEPARTEMEN
300
PIRINGAN
90
200 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
DEPARTEMEN
300
ASSEMBLING
300
PIRINGAN
90
200 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
ASSEMBLING
300
DEPARTEMEN
400
PEER KUPU
90
20 gram
180 gram
Man
Rp. 3.500
2
Rp.7.000
DEPARTEMEN
400
ASSEMBLING
400
PEER KUPU
90
20 gram
180 gram
Man
Rp. 3.500
2
Rp.7.000
ASSEMBLING
400
DEPARTEMEN
500
REFLECTOR
120
150 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
DEPARTEMEN
500
ASSEMBLING
500
REFLECTOR
120
150 gram
18.000 gram
Conveyor
Rp. 3.500
4
Rp.14.000
ASSEMBLING
500
PACKAGING
DOWNLIGHT
30
950 gram
28.500 gram
Conveyor
Rp. 3.500
5
Rp.17.500
PACKAGING
SHIPPING
DOWNLIGHT
30
950 gram
28.500 gram
Forklift
Rp. 3.500
10
Rp.35.000







TOTAL

Rp.199.500

TABEL IN FLOW

FROM/TO
RECEIVING
DEPT 100

ASS
 100
DEPT
200
ASS
200
DEPT
300

ASS
 300
DEPT
400

ASS
400
DEPT
500

ASS
500
PACKING
SHIPPING
TOTAL
RECEIVING

1
250 gram











250
Gram
DEPT
100

1
250 gram










250
Gram
ASS
100


1
300 gram









300
Gram
DEPT
200



1
300 gram








300
Gram
ASS
200




1
200 gram







200
Gram
DEPT
300





1
200 gram






200
Gram
ASS
300






1
20 gram





20
Gram
DEPT
400







1
20 gram




20
Gram
ASS
400








1
150 gram



150
Gram
DEPT
500









1
150 gram


150
Gram
ASS
500










1
950 gram

950
Gram
PACKING











1
950 gram
950
Gram
SHIPPING












1

TOTAL

250 gram

250 gram
300
gram
300
 gram
200
gram
200
gram
20
gram
20
gram
150
Gram
150
gram
950
gram
950
gram
3.740
gram


TABEL FROM TO CHART

FROM/TO
RECEIVING
DEPT 100

ASS
 100
DEPT
200
ASS
200
DEPT
300

ASS
 300
DEPT
400

ASS
400
DEPT
500

ASS
500
PACKING
SHIPPING
TOTAL
RECEIVING

1
Rp. 35.000











Rp35.000
DEPT
100
.
1
Rp. 14.000










Rp14.000
ASS
100


1
Rp
.14.000









Rp14.000
DEPT
200



1
Rp.
14.000








Rp14.000
ASS
200




1
Rp.
14.000







Rp14.000
DEPT
300





1
Rp.
14.000






Rp14.000
ASS
300






1
Rp
.7000





Rp 7.000
DEPT
400







1
Rp
.7000




Rp 7.000
ASS
400








1
Rp
14.000.



Rp 14.000
DEPT
500









1
Rp
.14.000


Rp 14.000
ASS
500










1
Rp
17.500

Rp 17.500
PACKING











1
Rp
35.000
Rp 35.000
SHIPPING












1

TOTAL

Rp
35.000
Rp
14.000
Rp
14.000
Rp.
14.000
Rp.
14.000
Rp
14.000
Rp
7.000
Rp
7.000
Rp
14.000
Rp
14.000
Rp
17.500
Rp
35.000
Rp
99.500


Metode Jumlah Unit Produksi ( Productive Output Method )


Metode ini digunakan untuk mengalokasikan beban penyusutan berdasarkan pada proporsi penggunaan aktiva yang sebenarnya. Metode penyusutan ini menggunakan hasil produksi sebagai dasar pengalokasian beban penyusutan untuk tiap periode, dengan dasar teori yang dipakai adalah bahwa suatu aktiva itu dimiliki untuk menghasilkan produk sehingga depresiasi juga didasarkan pada jumlah produk yang dapat dihasilkan.

Dalam metode ini beban penyusutan diperlakukan sebagai beban variabel sesuai dengan unit produksi yang dihasilkan tiap periode akuntansi, bukan beban tetap seperti dalam metode penyusutan garis lurus (Straight Line Method).

Kelemahan dari metode ini adalah sama seperti kelemahan yang terdapat pada metode jam jasa.

Untuk menghitung beban depresiasi periodik, pertama kali dihitung tarip depresiasi untuk tiap unit produk, kemudian tarip ini akan dikalikan dengan jumlah produk yang dihasilkan dalam periode tersebut.

Contoh :
mesin dengan harga perolehan Rp. 600.000,- taksiran nilai sisa sebesar Rp. 40.000,- , mesin ini ditaksir selama umur penggunaan akan menghasilkan 56.000 unit produk, maka depresiasi per unit produk dihitung sbb :

Depresiasi / unit = ( HP – NS ) / n
= ( 600.000 – 40.000 ) / 56.000
= 10

Apabila dalam tahun penggunaan pertama, mesin tersebut menghasilkan 18.000 unit produk, maka beban depresiasi untuk tahun itu sebesar 18.000 x 10 = 180.000